PONT-DE-LA-ROQUE Manche - 6 km west of Coutances
The Germans withdrew with the Americans on their heels

After the breakthrough of the Operation Cobra the Americans launched the pursuit. On 27 July the 1st Infantry Division and the CCB of the 3rd Armoured Division moved ahead on Saint-Lô road toward Coutances. The purpose was to encircle the German forces north of Coutances. But the city was not attained in the evening. The Germans withdrew to Brehal with the 6th and 4th Armoured Divisions on their heels. On 28 July the 4th Armoured Division liberated Coutances, while the CCB of the 2nd Armoured Division reached the river Sienne. The Germans had heavy defensive battle, General Hausser 7th Army's Commander in chief missed to be captured near Gavray. At Pont-de-la-Roque Allied Airforce attempted to blow the bridge over the river Sienne to prevent the Germans 's retreat. The bridge was destroyed after several attacks, but a Canadian pilot's aircraft is shot down and the Germans crossed the river. During the night of 29 to 30 July the 6th Armoured Division and the 79th Infantry Division spanned the river Sienne on an engineer bridge.
   
 
 
Bridge stele
Stele in memory of the American soldiers who died there. An information board tells about the Allied Airforce attempts to blow the bridge over the river Sienne, a Canadian pilot died in the fighting.
Situation : on the north bank, at the gate of the new bridge
 
 
   
ROAD MAP
 
INTERESTING WEB SITES

Personal web site about the 2rd US Armored Division
http://www.2ndarmoredhellonwheels.com/
Manche departmental tourism office web site
http://www.manchetourisme.com/

Personal web site about the Second World War Generals
http://www.generals.dk/

US Army official web site - US Army divisions structure
http://www.army.mil/cmh/lineage/cc/comp.htm

 
All rights of photos, texts, maps and graphics design are reserved